WQExplorer

As - 2012-06-05

Estuary/Wetlands

Date Station Result Mean Deviations from Mean
2012-06-13 11:42:00 TBTMAR - Talbert Marsh 1.1 1.062 0.125
2012-06-13 11:27:00 HUNWAR - Huntington Harbour at Warner Avenue 0.98 0.979 0.005
2012-06-13 10:34:00 TGDC05 - Bolsa Bay d/s E. Garden Grove Wintersburg Ch. 1 1.148 -0.385
2012-06-13 09:51:00 BBOLR - Bolsa Bay at observation pier 1.2 1.19 0.037
2012-06-13 09:35:00 HUNBCC - Huntington Harbour d/s of Bolsa Chica Ch. 1 0.941 0.228
2012-06-07 10:28:00 LNBTUB - Lower Newport Bay at TUB 0.9 0.902 -0.008
2012-06-05 11:39:00 UNBCHB - Upper Newport Bay at Coast Highway 1.1 0.912 0.676
2012-06-05 11:14:00 UNBNSB - Upper Newport Bay at Northstar Beach 1.1 0.921 0.614
2012-06-05 09:45:00 UNBJAM - Upper Newport Bay - Unit I Basin 1.2 0.861 1.064

Mass Emissions

Date Station Result Mean Deviations from Mean
2012-06-12 09:30:00 FCVA03 - Fullerton Creek d/s Valley View Rd. 4.7 4.057 1.464
2012-06-05 10:32:00 WYLSED - San Diego Creek at Harvard Avenue 3.9 3.99 -0.106
2012-06-05 10:27:00 CMCG02 - Costa Mesa Channel at Highland 2.3 2.583 -0.325
2012-06-05 10:10:00 SADF01 - Santa Ana Delhi Channel u/s Irvine Avenue 1.8 1.596 0.515
2012-06-05 10:00:00 BARSED - Peters Canyon Wash at Barranca Parkway 9.6 8.357 0.891
2012-06-05 09:42:00 CICF25 - Central Irvine Channel at I-5 5.1 4.031 0.908
2012-06-05 09:40:00 SDMF05 - San Diego Creek at Campus Drive 6.3 5.072 0.64

Non Storm Water

Date Station Result Mean Deviations from Mean

Industrial Facilities

Arsenic, Dissolved

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean
DBW Metals Recycling
3250 E Frontera St, Anaheim California 92806
3 0.016 0.008 2012-04-13 0.01 -0.696

Arsenic, Total

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean
San Timoteo Sanitary Landfill
31 Refuse Road, Redlands California 92373
2 0 0 2012-04-26 0 0
2012-04-16 0 0
DBW Metals Recycling
3250 E Frontera St, Anaheim California 92806
3 0.023 0.021 2012-04-13 0.01 -0.623

Arsenic, Total Recoverable

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean
Badlands Sanitary Landfill
31125 Ironwood Avenue, Moreno Valley California 92388
5 0.026 0.037 2012-04-23 0.007 -0.502

Recent Violations

Date Facility Description
2012-06-19 Precision Custom Stone
1441 Red Gum St, Anaheim California 92806
Failure to implement appropriate BMPs for housekeeping issues and spills
2012-06-19 Precision Custom Stone
1441 Red Gum St, Anaheim California 92806
Heavy layer of dust on floor inside shop is contributing to tracking outside into exposed areas.
2012-05-24 Riverside Scrap Iron & Metal Corporation
2993 Sixth Street, Riverside California 92517
Daily street sweeping is scheduled, except on Thursdays, when the City does its scheduled street sweeping. The last street sweeping event was yesterday December 18th. The dirt and debris inside the berm appeared to not have been swept for several days. On the north side of the maintenance building an oil spill appeared from removing a sheer head. Frank will have the soil picked up and properly disposed, before the end of the day.
2012-05-08 Eagle Scrap Metal
741 Monroe Way, Placentia California 92870
See November 6, 2012 inspection report.
2012-05-08 Eagle Scrap Metal
741 Monroe Way, Placentia California 92870
See November 13, 2012 inspection report.
2012-05-08 Eagle Scrap Metal
741 Monroe Way, Placentia California 92870
Discharger failed to submit CAP by 8/29/2014
2012-04-30 Cactus Avenue / Nason Street Improvement Project Capital Improvement Project #12-12599520
14775 Nason Street Moreno Valley, CA 92555, Moreno Valley California 92555
Inadequate BMP implementation to prevent erosion of sediment near the bridge structure and over the top of slope along the channel. Inadequate tracking controls to prevent tracking across the channel bottom below the bottom check-dam. Placement of dirt check-dam into the channel bottom without proper controls to prevent it from being a source of sediment for transport downstream.
2012-04-24 Birch Hills
S Kraemer Blvd, Brea California 92821
Inadequate BMP implementation.
2012-04-24 8th Street Project
8th Street, National City California 91950
Perimeter controls around staging area missing a section, requiring replacement. Effective soil cover not provided for several disturbed soil areas that are inactive or could be considered or scheduled to be inactive. Run-on controls not provided to protect disturbed soil areas with erosion controls.