Date Station Result Mean Deviations from Mean

Mass Emissions

Date Station Result Mean Deviations from Mean
2014-04-22 11:59:00 WYLSED - San Diego Creek at Harvard Avenue 3.7 3.99 -0.341
2014-04-22 11:18:00 CMCG02 - Costa Mesa Channel at Highland 2.4 2.583 -0.21
2014-04-22 10:50:00 CICF25 - Central Irvine Channel at I-5 3.5 4.031 -0.45
2014-04-22 10:30:00 SDMF05 - San Diego Creek at Campus Drive 4.6 5.072 -0.246

Non Storm Water

Date Station Result Mean Deviations from Mean

Industrial Facilities

Arsenic, Dissolved

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean

Arsenic, Total

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean
Ramona Disposal Service
324 Maple St, Ramona California 92065
13 0.064 0.094 2014-04-01 0.2 1.44
2014-02-28 0.2 1.44
EDCO Disposal Corp
3660 Dalbergia St, San Diego California 92113
7 0.05 0.075 2014-04-01 0.2 2.012
EDCO Station
8182 Commercial St, La Mesa California 91942
7 0.059 0.096 2014-04-01 0.2 1.463
2014-02-28 0.2 1.463
California Cascade Industries Fontana Inc
8395 Sultana Ave, Fontana California 92335
7 0.01 0 2014-02-28 0.01 0
Lighting Resources LLC
805 E Francis St, Ontario California 91761
2 0 0 2014-02-28 0 0
US Navy Aux Landing Field
Bldg 3 Nas North Island, San Diego California 92135
1 3.8 0 2014-02-28 3.8 0
Ajax Boiler Inc
2701 S Harbor Blvd, Santa Ana California 92704
3 0.007 0.002 2014-02-24 0.006 -0.577

Arsenic, Total Recoverable

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean

Recent Violations

Date Facility Description
2014-04-30 Hilton Garden Inn
4200 Taylor Street, San Diego California 92110
Large stockpile without evident erosion control BMPs prompted inspection. Site generally lacked adequate good housekeeping BMPs, erosion control BMPs, maintenance of perimeter sediment control BMPs, as well as inadequate implementation of corrective actions identified by QSP.
2014-04-28 La Jolla Del Rey Phase 1
6316 Gullstrand Street, San Diego California 92122
Construction site lacked adequate BMP implementation including lack of erosion and sediment controls. Violation resulted in discharges of sediment from the construction site to the MS4.
2014-04-28 La Jolla Del Rey Phase 1
6316 Gullstrand Street, San Diego California 92122
Observed discharges of sediment laden storm water from construction site perimeter.
2014-04-28 La Jolla Del Rey Phase 1
6316 Gullstrand Street, San Diego California 92122
Sediment and sediment-laden storm water discharges from the site observed during inspection. Discharges due to inadequate implementation of BMPs.
2014-04-28 La Jolla Del Rey Phase 1
6316 Gullstrand Street, San Diego California 92122
During follow-up inspection inadequate BMPs were observed including concrete washout areas.
2014-04-28 La Jolla Del Rey Phase 1
6316 Gullstrand Street, San Diego California 92122
Complete lack of erosion control BMPs for inactive areas. Inadequate implementation of perimeter sediment control and run-on/runoff control BMPs. Inadequate maintenance of perimeter sediment control BMPs. Inadequate good site management "housekeeping" BMPs.
2014-04-24 2T0404 805 Carrol Canyon Road
2863 Carmel Valley Rd, San Diego California 92014
I-805 Carroll Canyon construction site not enrolled under Construction General Permit Order No. 2009-0009-DWQ as required by Catrans Permit Order No. 2012-0011-DWQ. Incorrect risk level determination. Lack of training records. Inadequate implementation of BMPs, especially erosion and perimeter sediment controls.
2014-04-18 Rt 73 Storm Water Project 0H440
Rt 73 from Bison to Rt 5, Newport Coast California 92656
BMP's were not implemented around stockpile of crushed rock and a nearby DI. Sediment runoff from stockpile accumulated in DI.
2014-04-11 SR 91 CORRIDOR IMPROVEMENT PROJECT
2455 ANSELMO DRIVE, Corona California 92879
- No BMP's at WB 91 Serfas Club off-ramp for stormwater runoff along the right shoulder. - Tracking off-site occurred at Frontage Road and Ridgeview Terrace, east of Serfas Club Drive from an active construction area - BMP¿s were not maintained at Serfa
2014-04-11 Millenia Apartments Lot 4
Birch Rd and Eastlake Pkwy, Chula Vista California 91913
Erosion control BMPs, sediment control BMPs, and perimeter control BMPs are either absent or deficient throughout the site. There is gross lack of housekeeping BMPs to prevent exposure, discharge of, and tracking of sediment and other wastes to storm drain inlets, as well as a lack of BMPs to prevent the transport of sediment and other wastes offsite by storm water flows. Fairfield has also failed to provide Storm Water Pollution Prevention training to all contractors, subcontractors, and all other personnel working at the site, as required by the permit. In addition to the SWPPP employee training, Fairfield has failed to maintain training logs as required by the permit. SEL Email sent 01/13/2016. City of Chula Vista issued NOV/CAO/CDO/AC for $10,000. on 01/13/20-16.
2014-04-11 SR 91 CORRIDOR IMPROVEMENT PROJECT
2455 ANSELMO DRIVE, Corona California 92879
- At the WB 91 Serfas Club off-ramp at Wardlow Circle industrial business park, DI was not protected with BMP¿s to reduce sediment run-off into the DI. - At the 91 EB Lincoln Avenue off-ramp, BMP¿s were not maintained. A 4 inch HDPE pipe was placed at th
2014-04-11 SR 91 CORRIDOR IMPROVEMENT PROJECT
2455 ANSELMO DRIVE, Corona California 92879
Wattles observed at various locations were improperly installed to limit or reduce sediment run-off from construction areas. Wattles were displaced or not installed to limit or reduce sediment run-off. Wattles were not maintained from sediment build-up or damaged by vehicular traffic. Tracking BMP¿s were not installed at various locations and/or tracking BMP¿s were not maintained. Tracking off-site onto public streets did not appear to be managed in a timely manner.
2014-04-04 Fairfield Luxury Apartments
7380 Parkway Drive, San Diego California 91942
Inspected the site based on Risk Level 1 requirements. Observed construction vehicle lacking adequate BMPs to prevent oil, grease, or fuel to leak in to the ground. Observed inadequate perimeter sediment controls to sufficiently control erosion and sediment discharges from the site. Observed a lack of effective soil cover for an inactive slope, to protect slope from predicted storms. Observed protection for several storm drains rendered ineffective. Observed stockpile lacking adequate protection and containment. Observed evidence of sediment discharged to storm drain as a result storm water runoff flow through areas with inadequate soil cover for inactive slope, perimeter sediment controls, internal runoff controls, and stockpile management.
2014-03-28 Northwest Village Creek
602 Euclid Avenue, San Diego California 92114
Discharge of sediment-laden storm water from the site directly to Chollas Creek. Sediment discharged in storm water has not been controlled to the BCT standard due to lack or erosion controls and inappropriately used and/or designed sediment traps that do not adequately treat storm water before discharge.
2014-03-28 Northwest Village Creek
602 Euclid Avenue, San Diego California 92114
Lack of erosion controls, and inadequate perimeter sediment controls and run-on/runoff controls.
2014-03-21 Courtyard by Marriott
1420 S Harbor Blvd, Anaheim California 92802
Defecient BMP implementation.
2014-03-20 Sedona
Northwest of Inland Empire Boulevard and Turner Avenue, Ontario California 91764
A couple of areas without proper perimeter controls the day before a rain event.
2014-03-20 Candee Grading Plan
35070 Antelope Road, Murrieta California 92563
Ineffective perimeter control BMPs adjacent to construction site exit. Sediment control basin not stabilized with effective soil cover.
2014-03-20 El Camino Real Widening
ECR Btwn Cannon Road and Tamarack Avenue, Carlsbad California 92010
Observed several areas lacking controls to prevent sediment discharges from disturbed soil areas to adjacent areas and offsite, construction vehicles lacking drip pans, and soil stockpiles without protection or containment.
2014-03-12 AUTUMN TERRACE
34684 Bella Vista , Yucaipa California 92399
Photos taken the day after a rain event and no effective erosion control or sediment control observed.
2014-03-12 Valencia
1350 San Altos Place, Lemon Grove California 91945
Discharge of sediment laden storm water runoff to an unnamed tributary to Chollas Creek.
2014-03-12 Valencia
1350 San Altos Place, Lemon Grove California 91945
Failure to employ erosion control BMPs and inadequate sediment control BMPs.
2014-03-12 Valencia
1350 San Altos Place, Lemon Grove California 91945
Failure to implement erosion and sediment control BMPs.
2014-03-12 Valencia
1350 San Altos Place, Lemon Grove California 91945
Failure to have erosion and sediment control BMPs on Seville Way.
2014-03-12 Valencia
1350 San Altos Place, Lemon Grove California 91945
Evidence of unauthorized discharges of sediment and sediment-laden storm water from the site on December 3, 4, and 11, 2014 due to inadequate implementation of erosion control, sediment control, and run-on/runoff control BMPs, documented by the City of Lemon Grove.
2014-03-12 Valencia
1350 San Altos Place, Lemon Grove California 91945
Lack of good site management "housekeeping" BMPs. Lack or erosion control BMPs for inactive areas. Lack or erosion control BMPs for active areas required by Risk Level 2 sites. Lack of linear sediment controls for exposed slopes required by Risk Level 2 sites. Inadequate perimeter sediment controls and run-on/runoff controls.
2014-03-12 Valencia
1350 San Altos Place, Lemon Grove California 91945
The storm water manager for the City of Lemon Grove notified the San Diego Water Board of an unauthorized non-storm water discharge from this construction site that transported sediment to their MS4.
2014-03-12 Valencia
1350 San Altos Place, Lemon Grove California 91945
Failure to protect concrete drainage ditch from hillside erosion (suggested installing fiber rolls), failure to implement good housekeeping practices (observed construction trash on ground), failure to use designated concrete washouts (observed concrete washout to ground in several backyards and in paved street), failure to have adequate perimeter sediment control (suggested adding additional gravel bags and fiber rolls along the southeast and northeast entrances. Regional Board inspection on 20 NOV 2015 documented that the violations were addressed except that there was still a lot of construction trash throughout the site (trash observed during inspection on 12 NOV 2015 was not observed on 20 NOV 2015).
2014-03-12 Valencia
1350 San Altos Place, Lemon Grove California 91945
Numerous site-wide failures to have erosion and sediment control BMPs.
2014-03-10 Family Health Centers of San Diego
5160 Federal Boulevard, San Diego California 92105
Site was discharging clear water; however, there were serious BMP violations and therefore the discharge was not authorized.
2014-03-10 Family Health Centers of San Diego
5160 Federal Boulevard, San Diego California 92105
Perimeter controls not installed properly, no cross barriers and general inadequate sediment controls
2014-03-10 Family Health Centers of San Diego
5160 Federal Boulevard, San Diego California 92105
No erosion controls observed on 2 acre disturbed site