WQExplorer

Be - 2015-06-10

Estuary/Wetlands

Date Station Result Mean Deviations from Mean
2015-06-10 10:52:00 TBTMAR - Talbert Marsh 0.05 0.05 0

Mass Emissions

Date Station Result Mean Deviations from Mean

Non Storm Water

Date Station Result Mean Deviations from Mean

Industrial Facilities

Beryllium, Dissolved

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean

Beryllium, Total

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean

Beryllium, Total Recoverable

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean

Recent Violations

Date Facility Description
2015-06-24 Rail projects within the LOSSAN and Mid Coast Corridor
5066 Santa Fe Street, San Diego California 92109
6. Unauthorized discharges- Multiple unauthorized discharges of sediment and sediment laden stormwater to Rose Creek were observed due to missing or ineffective BMPs.
2015-06-24 Rail projects within the LOSSAN and Mid Coast Corridor
5066 Santa Fe Street, San Diego California 92109
1. Missing and/or ineffective perimeter control- 2. Inadequate runon/runoff controls- 3. Construction equipment and vehicles observed without appropriate BMPs (e.g. drip pans) 4. Missing and/or ineffective erosion control BMPs- 5. Missing and/or ineffective sediment control BMPs-