Cd - 2015-07-14
Estuary/Wetlands
Date | Station | Result | Mean | Deviations from Mean |
---|
Mass Emissions
Date | Station | Result | Mean | Deviations from Mean |
---|---|---|---|---|
2015-07-14 12:30:00 | CMCG02 - Costa Mesa Channel at Highland | 0.12 | 0.188 | -0.465 |
2015-07-14 10:49:00 | WYLSED - San Diego Creek at Harvard Avenue | 0.67 | 0.202 | 3.849 |
Non Storm Water
Date | Station | Result | Mean | Deviations from Mean |
---|
Industrial Facilities
Cadmium, Dissolved
Facility Name | Expected | Most Recent | ||||
---|---|---|---|---|---|---|
Records | Mean | Std Dev | Date | Result | Deviations from Mean |
Cadmium, Total
Facility Name | Expected | Most Recent | ||||
---|---|---|---|---|---|---|
Records | Mean | Std Dev | Date | Result | Deviations from Mean |
Cadmium, Total Recoverable
Facility Name | Expected | Most Recent | ||||
---|---|---|---|---|---|---|
Records | Mean | Std Dev | Date | Result | Deviations from Mean |
Recent Violations
Date | Facility | Description |
---|---|---|
2015-06-24 | Rail projects within the LOSSAN and Mid Coast Corridor
5066 Santa Fe Street, San Diego California 92109 |
6. Unauthorized discharges- Multiple unauthorized discharges of sediment and sediment laden stormwater to Rose Creek were observed due to missing or ineffective BMPs. |
2015-06-24 | Rail projects within the LOSSAN and Mid Coast Corridor
5066 Santa Fe Street, San Diego California 92109 |
1. Missing and/or ineffective perimeter control- 2. Inadequate runon/runoff controls- 3. Construction equipment and vehicles observed without appropriate BMPs (e.g. drip pans) 4. Missing and/or ineffective erosion control BMPs- 5. Missing and/or ineffective sediment control BMPs- |