WQExplorer

Hg - 2014-12-23

Estuary/Wetlands

Date Station Result Mean Deviations from Mean

Mass Emissions

Date Station Result Mean Deviations from Mean
2014-12-23 11:00:00 CMCG02 - Costa Mesa Channel at Highland 0.05 0.051 -0.043
2014-12-23 10:40:00 SADF01 - Santa Ana Delhi Channel u/s Irvine Avenue 0.05 2.82 -0.437
2014-12-23 10:15:00 SDMF05 - San Diego Creek at Campus Drive 0.05 2.613 -0.45
2014-12-23 09:45:00 WYLSED - San Diego Creek at Harvard Avenue 0.05 2.069 -0.5
2014-12-23 09:30:00 BARSED - Peters Canyon Wash at Barranca Parkway 0.05 6.828 -0.291
2014-12-23 09:05:00 CICF25 - Central Irvine Channel at I-5 0.05 0.049 0.144

Non Storm Water

Date Station Result Mean Deviations from Mean

Industrial Facilities

Mercury, Dissolved

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean

Mercury, Total

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean
Naval Weapons Station Seal Beach
800 Seal Beach Blvd, Seal Beach California 90740
31 0.142 0.29 2014-12-02 0.1 -0.145
Filter Recycling Services Inc
180 W Monte Ave, Bloomington California 92316
21 0.01 0.03 2014-12-16 0.001 -0.313
2014-12-02 0.001 -0.313
SDGE Miramar Facility
6875 Consolidated Way, San Diego California 92121
11 0.02 0.045 2014-12-12 0 -0.448
EDCO Disposal Corp
6770 Federal Blvd, Lemon Grove California 91945
9 0.05 0.097 2014-12-12 0.001 -0.507
EDCO Disposal Corp
3660 Dalbergia St, San Diego California 92113
7 0.069 0.119 2014-12-12 0 -0.582
Safety Kleen Corp
7979 Palm Ave, Highland California 92346
3 0.021 0.036 2014-12-30 0 -0.577
EDCO Station
8182 Commercial St, La Mesa California 91942
7 0.008 0.019 2014-12-12 0.001 -0.386
Jacks Disposal Service Inc
5455 Industrial Pkwy, San Bernardino California 92407
4 0.1 0.115 2014-12-02 0.2 0.866
Mountain Disposal Service
988 Old Waterman Canyon Road, Crestline California 92325
2 0.2 0 2014-12-02 0.2 0
West Valley MRF
13373 Napa St, Fontana California 92335
3 0.001 0.001 2014-12-02 0.001 0.272
East Valley Recycling Transfer
1150 1250 S Tippecanoe Ave, San Bernardino California 92408
3 0.767 0.981 2014-12-02 1.05 0.289
RA Nelson MRF Transfer Station
1830 Agua Mansa Rd, Riverside California 92509
4 0.05 0.1 2014-12-12 0.067 0.167
William Bradley Park
9999 Rancho Santa Fe Rd and Linda Vista Dr San Marcos CA 92069, San Marcos California 92069
3 0 0 2014-12-12 0 0
Burrtec Fontana Yard
9890 CHERRY Ave, Fontana California 92335
4 0.1 0.115 2014-12-12 0.2 0.866
2014-12-02 0.2 0.866

Mercury, Total Recoverable

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean
EDCO Disposal Corp
7844 Armour St, San Diego California 92111
2 0.001 0 2014-12-12 0.001 0
Park Disposal
6762 Stanton Ave, Buena Park California 90621
1 0.001 0 2014-12-12 0.001 0

Recent Violations

Date Facility Description
2014-12-23 Correia JHS Retaininng Wall
4302 Valeta Street, San Diego California 92107
A discharge of sediment-laden water was observed by a resident on September 15, 2015, and reported to the San Diego Water Board on September 16, 2015.
2014-12-23 Correia JHS Retaininng Wall
4302 Valeta Street, San Diego California 92107
The slopes along northern perimeter did not have adequate erosion control BMPs.
2014-12-23 Correia JHS Retaininng Wall
4302 Valeta Street, San Diego California 92107
The site did not have adequate sediment controls to prevent a discharge. Photos of the site were provided to the San Diego Water Board on 9/20/15 by a nearby resident.
2014-12-23 Correia JHS Retaininng Wall
4302 Valeta Street, San Diego California 92107
Sediment-laden water entered the storm drain inlet.
2014-12-23 Correia JHS Retaininng Wall
4302 Valeta Street, San Diego California 92107
The site did not have adequate erosion controls to prevent a discharge. Photos of the site were provided to the San Diego Water Board on 9/20/15 by a nearby resident.
2014-12-23 Correia JHS Retaininng Wall
4302 Valeta Street, San Diego California 92107
Slopes on northern perimeter did not have adequate sediment control BMPs.
2014-12-10 Steris Expansion
1000 South Sarah Place, Ontario California 91761
Observed a storm drain inlet at the bottom of a drainage basin that had gravel bags around it. The BMP was inadequate since the gravel bags would easily be overwelmed by the volume of water flowing into the basin. Requested that the riser be extended and silt screen wraped around the riser. Also, there were several check dams at the site that had significant sediment build-up behind them that needs to be cleaned.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section E.4 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to apply linear sediment controls along the toe of the slope, face of the slope, and at the grade breaks of exposed slopes to comply with sheet flow lengths in accordance with Table 1 in Attachment D to Order No. 2009-0009-DWQ.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision V.A.2 of State Water Board Order No. 2009-0009-DWQ: Failure to minimize or prevent pollutants in storm water discharges and authorized non-storm water discharges through the use of controls, structures, and management practices that achieve Best Conventional Pollutant Control Technology (BCT) for conventional pollutants.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section A.1.b of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to minimize or prevent pollutants in storm water and authorized non-storm water discharges through the use of controls, structures, and management practices that achieve BCT for conventional pollutants.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section E.3 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to implement appropriate erosion control BMPs (runoff control and soil stabilization) in conjunction with sediment control BMPs for areas under active construction. Active areas of construction are areas undergoing land surface disturbance. This includes construction activity during the preliminary stage, mass grading stage, streets and utilities stage and the vertical construction stage.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section E.1 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section E.2 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to, at minimum, design sediment basins according to the method provided in CASQA¿s Construction BMP Guidance Handbook.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section F.1 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to effectively manage all run-on, all runoff within the site and all runoff that discharges from the site. Run-on from offsite shall be directed away from all disturbed areas or shall collectively be in compliance with the effluent limitations in the CGP.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section G.3 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Upon identifying failures or other shortcomings, as directed by the QSP, Failure to begin implementing repairs or design changes to BMPs within 72 hours of identification and complete the changes as soon as possible.
2014-11-19 Black Angus Restaurant at North County Fair Mall
296 East Via Rancho Parkway, Escondido California 92025
Construction delayed. Only surveyors active on site shooting elevations on dirt site. Perimeter controls deficient. Fiber rolls are old/worn and not properly secured/stakeed in. Light rain at time of inspection. Some small quantities of sediment observed outside of perimeter fence on parking lot asphalt. Pointed this out to Earl Pritchard, job supt. Also advised him that a COI needs to be submitted for the change in construction dates (delay) from Oct 2014-March 2015, to, April 2015-October 12015. According to Earl, grading will begin next week after rain stops.