WQExplorer

Sb - 2014-02-20

Estuary/Wetlands

Date Station Result Mean Deviations from Mean
2014-02-20 13:23:00 LNBTUB - Lower Newport Bay at TUB 0.25 0.255 -0.105
2014-02-20 12:48:00 LNBHIR - Lower Newport Bay at Harbor Island Reach 0.25 0.246 0.124
2014-02-20 12:26:00 UNBCHB - Upper Newport Bay at Coast Highway 0.27 0.266 0.062
2014-02-20 11:08:00 UNBNSB - Upper Newport Bay at Northstar Beach 0.3 0.283 0.278
2014-02-20 10:22:00 UNBSDC - Upper Newport Bay - Unit II Basin 0.28 0.299 -0.229
2014-02-20 09:40:00 UNBJAM - Upper Newport Bay - Unit I Basin 0.3 0.349 -0.617

Mass Emissions

Date Station Result Mean Deviations from Mean
2014-02-19 10:52:00 SADF01 - Santa Ana Delhi Channel u/s Irvine Avenue 0.5 0.5 0
2014-02-19 10:47:00 BARSED - Peters Canyon Wash at Barranca Parkway 0.5 0.5 0
2014-02-19 10:20:00 WYLSED - San Diego Creek at Harvard Avenue 0.5 0.5 0
2014-02-19 09:51:00 SDMF05 - San Diego Creek at Campus Drive 0.5 0.5 0

Non Storm Water

Date Station Result Mean Deviations from Mean

Industrial Facilities

Antimony, Dissolved

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean

Antimony, Total

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean

Recent Violations

Date Facility Description
2014-03-05 Tr 18080
Archibald Ave at Merrill Avenue, Ontario California 91762
Lacks adequate perimeter control.
2014-02-28 Montage
4393 Philadelphia Street, Chino California 91710
Housekeeping needs improvement. Tracking on the interior streets, degraded BMPs, Sediment buildup on streets and behind BMPs on Norton Avenue. Portable Toilets on concrete ledge above stormwater inlet leading to a basin that overflows to the channel (installed on Friday 4/17/15). Bill indicated that no overflow has occurred to date from the basin. Notified Bill that a verbal violation will be noted in SMARTs for the site.
2014-02-28 Montage
4393 Philadelphia Street, Chino California 91710
Sediment basin should be sized and designed according to CASQA manual. Basin clearly has no emergency overflow.
2014-02-25 Daily II Reservoir Tank
Daily Road, Menifee California 92584
Failed to implement adequate cover for inactive areas and to implement effective perimeter controls.
2014-02-24 Tract 31920 7
Diamond Drive, Lake Elsinore California 92530
Staff inspected the site a day after it rained. The site was in active construction. Staff only inspected a part of the site. Only BMP observed was an inlet protection. The active construction area had no BMPs.
2014-01-29 Kearny High School Field Improvements
7651 Wellington Way, San Diego California 92111
Several housekeeping BMPs are required including trash and construction debris management, proper concrete waste disposal.
2014-01-29 Kearny High School Field Improvements
7651 Wellington Way, San Diego California 92111
Sediment BMPs and perimeter control were missing or inadequate. Sediment was seen on the sidewalk and there was a high potential for the sediment to reach the street and flow offsite.
2014-01-27 Ryans Express Motorcoach
3442 Sutherland Street, San Diego California 92110
No signage at site entrance. Rosemary was onsite in the office. Two coach buses parked on lot. Maintenance shop is indoors/garage.There are drain inlets outside that may go to a o/w separator (sump) Rosemary could not confirm. SWPPP not onsite -Rosemary said that the files are packed up including SWPPP. She said that this location (division) is going to be closing but another moving in, no further info. There are 55 gallon drums and oil/antifreeze containers and degreaser containers on the ground outside at the site without secondary containment. Two monitoring well heads seen onsite neat northern boundary. Wil Bartlett is the corporate Safety Mgr. Consultant is Evergreen/Safety Clean. Rosemary's email: RDinh@Ryanstransportation.com
2014-01-27 Glenwood Palmilla Commercial Development
23443 Nutmeg Street , Murrieta California 92562
Sediment tracking observed in parking lot leading to and into Jackson Street. No tracking control BMPs observed.
2014-01-14 Triumph Processing Embee Div
2136 S Hathaway St, Santa Ana California 92705
Secondary containment, splash from chiller, condensate, secondary containment for scrap metal bins, regular sweeping of storm water channels.
2014-01-09 La Jolla Del Rey Phase 2
6345, San Diego California 92121
Unauthorized discharges
2014-01-09 La Jolla Del Rey Phase 2
6345, San Diego California 92121
I observed multiple BMP violations during an inspection of the site perimeter that resulted in discharges of sediment to the MS4.
2014-01-09 La Jolla Del Rey Phase 2
6345, San Diego California 92121
Sediment and sediment-laden water discharged offsite observed due to inadequate implementation of erosion and sediment control BMPs.
2014-01-09 La Jolla Del Rey Phase 2
6345, San Diego California 92121
During a follow-up inspection to my 12/12/2014 inspection, I observed continued and additional (concrete washout) violations at the construction site.
2014-01-09 La Jolla Del Rey Phase 2
6345, San Diego California 92121
Inadequate good site management "housekeeping BMPs. Inadequate erosion control BMPs for inactive areas. Inadequate perimeter sediment control and run-on/runoff control BMPs.
2014-01-09 La Jolla Del Rey Phase 2
6345, San Diego California 92121
During a perimeter inspection of the construction site evidence of sediment laden discharges along the perimeter were observed.
2014-01-07 North Perris Distribution Center
400 Harley Knox Blvd, Perris California 92571
BMPs were lacking all around the site and are inadequate to protect against discharge of contaminants from the site. Storm drains were left without any BMPs and could discharge from the site. No BMPs were noted at the boundary of the construction area and sediments can easily discharge to streets. The metal tracking grate was filled with dirt and was ineffective during the inspections. This area requires special attention to comply with the general permit. Stockpiles of soil had no BMPs to protect against sediment runoff from this area. A storm drain inlet (covered by a piece of plywood) was noted adjacent to the stockpile without any BMPs. A net is used in front of the site rather than the silt fence, which is not protective of water quality. All BMPs must be re-evaluated and implemented as needed. Additional BMPs may be required to bring the site into compliance. No BMPs were noted within the street to collect the sediments tracked of site or sediment runoff as a result of a rain event. The street is swept every other day. This frequency may not be adequate. Records of inspections and monitoring were not found at the site. These documents must remain on site at the construction trailer for review by the regulatory agencies. Please send, at least, a copy of the last 3 weekly inspections to me at the email provided below. An email verbal enforcement was issued on 8-14-14.