WQExplorer

Sb - 2014-12-05

Estuary/Wetlands

Date Station Result Mean Deviations from Mean
2014-12-05 08:37:00 UNBJAM - Upper Newport Bay - Unit I Basin 0.48 0.349 1.638

Mass Emissions

Date Station Result Mean Deviations from Mean

Non Storm Water

Date Station Result Mean Deviations from Mean

Industrial Facilities

Antimony, Dissolved

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean

Antimony, Total

Facility Name Expected Most Recent
Records Mean Std Dev Date Result Deviations from Mean
Del Mar Fairgrounds Racetrack
2260 Jimmy Durante Blvd, Del Mar California 92014
12 0.01 0.013 2014-12-12 0.005 -0.384
2014-12-02 0.005 -0.384

Recent Violations

Date Facility Description
2014-12-10 Steris Expansion
1000 South Sarah Place, Ontario California 91761
Observed a storm drain inlet at the bottom of a drainage basin that had gravel bags around it. The BMP was inadequate since the gravel bags would easily be overwelmed by the volume of water flowing into the basin. Requested that the riser be extended and silt screen wraped around the riser. Also, there were several check dams at the site that had significant sediment build-up behind them that needs to be cleaned.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision V.A.2 of State Water Board Order No. 2009-0009-DWQ: Failure to minimize or prevent pollutants in storm water discharges and authorized non-storm water discharges through the use of controls, structures, and management practices that achieve Best Conventional Pollutant Control Technology (BCT) for conventional pollutants.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section E.2 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to, at minimum, design sediment basins according to the method provided in CASQA¿s Construction BMP Guidance Handbook.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section F.1 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to effectively manage all run-on, all runoff within the site and all runoff that discharges from the site. Run-on from offsite shall be directed away from all disturbed areas or shall collectively be in compliance with the effluent limitations in the CGP.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section G.3 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Upon identifying failures or other shortcomings, as directed by the QSP, Failure to begin implementing repairs or design changes to BMPs within 72 hours of identification and complete the changes as soon as possible.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section E.4 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to apply linear sediment controls along the toe of the slope, face of the slope, and at the grade breaks of exposed slopes to comply with sheet flow lengths in accordance with Table 1 in Attachment D to Order No. 2009-0009-DWQ.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section A.1.b of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to minimize or prevent pollutants in storm water and authorized non-storm water discharges through the use of controls, structures, and management practices that achieve BCT for conventional pollutants.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section E.3 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to implement appropriate erosion control BMPs (runoff control and soil stabilization) in conjunction with sediment control BMPs for areas under active construction. Active areas of construction are areas undergoing land surface disturbance. This includes construction activity during the preliminary stage, mass grading stage, streets and utilities stage and the vertical construction stage.
2014-11-24 El Camino Real Road Widening Project
4501 El Camino Real, Carlsbad California 92008
Provision X and Section E.1 of Attachment D of State Water Board Order No. 2009-0009-DWQ: Failure to establish and maintain effective perimeter controls and stabilize all construction entrances and exits to sufficiently control erosion and sediment discharges from the site.
2014-11-19 Black Angus Restaurant at North County Fair Mall
296 East Via Rancho Parkway, Escondido California 92025
Construction delayed. Only surveyors active on site shooting elevations on dirt site. Perimeter controls deficient. Fiber rolls are old/worn and not properly secured/stakeed in. Light rain at time of inspection. Some small quantities of sediment observed outside of perimeter fence on parking lot asphalt. Pointed this out to Earl Pritchard, job supt. Also advised him that a COI needs to be submitted for the change in construction dates (delay) from Oct 2014-March 2015, to, April 2015-October 12015. According to Earl, grading will begin next week after rain stops.
2014-10-27 Corona Clay Recycling Plant
10600 Dawson Canyon Road, Corona California 92883
Lack of structural treatment BMP that can reduce pollutants in stormwater discharges.
2014-10-27 Corona Clay Recycling Plant
10600 Dawson Canyon Road, Corona California 92883
Lack of implementation of BMPs to reduce pollutants in stormwater discharges.
2014-10-27 Corona Clay Recycling Plant
10600 Dawson Canyon Road, Corona California 92883
Lack of effective structural controls implemented.